Another bathroom that I worked on recently. It needed to be finished in a hurry so that the customer could get moved into the home. The only problem was that someone else started it, and just about everything was wrong. I had to rip out everything and start over, otherwise the shower would have started leaking in no time. I used GP's fiberglass lined backer board and redguard to water proof the shower and as a backer for the tile. In addition to the tile I redid most of the drywall and tile on the floor. I also had to heavily modify a pocket door that someone else installed that actually pocketed behind the shower, to stiffen it up and make sure everything would remain solid.